Njord field

Njord is producing 54,039 barrels of oil equivalent a day — 1.3% of everything the Norwegian Continental Shelf produced in May 2026, ranking 17 of the 94 fields in production.

Production
54,039 boe/d
Share of NCS
1.3%
Operator
Equinor Energy AS
First oil
1997

What it produces

In May 2026 the field delivered 54,039 barrels of oil equivalent a day, classified by the directorate as oil — roughly 25% oil and 60% gas by energy content. Output has moved up 228.9% over the past twelve months, and the directorate's profile for the field is growing. The field's best year was 2000, averaging 67,390 boe/d — today it runs at 80% of that.

Since 1997, Njord has produced roughly 288 million barrels of oil equivalent in total. The directorate's estimate of recoverable resources is 417 million boe, of which about 69% has now been recovered; 131 million boe remained as of 31.12.2025.

Timeline

  1. 1986
    Proven by exploration well 6407/7-1 S
  2. 1997
    First production reported
  3. 1997
    Njord Stl (loading system) enters service
  4. 2000
    Best year to date — 67,390 boe/d
  5. 2022
    Njord A (semisub steel) enters service
  6. 2022
    Njord Bravo (fsu) enters service

Production by year, 1997–2026

2000 · 67,39019972026
OilGasNGL/condensateboe/d
Full table, year by year
YearOilGasNGLTotal boe/d
19976,325006,325
199829,2200029,220
199960,7050060,705
200067,3900067,390
200150,6100050,610
200232,1070032,107
200330,4000030,400
200429,0280029,028
200531,5390031,539
200623,9910023,991
200718,1461,29357820,017
200816,28234,32615,54566,153
200912,80531,43714,46958,711
201016,56430,62913,75160,944
20119,31723,85910,57743,753
20125,44613,0005,65724,103
20134,6479,3443,75517,746
20146,37210,5054,74121,617
20156,59316,6107,26530,468
20161,6393,4421,5636,644
20170000
20180000
20190000
20200000
20210000
2022180018
20235,1918,1642,15115,506
20242,6808,0432,13312,856
20253,51118,5324,52726,569
202613,60734,0888,36956,064

Average daily rates per calendar year, from Sokkeldirektoratet's monthly production figures. The final year is the average through May 2026.

Discovery and drilling

The field was proven by exploration well 6407/7-1 S in 1986. The directorate's wellbore register lists 54 wellbores on Njord: 8 exploration and 46 development. The deepest reaches 6,602 metres measured depth. Water depth at the field's installations is 100.5 to 330 metres.

Installations on Njord

  • Njord ASemisub Steel2022
  • Njord BravoFsu2022
  • Njord StlLoading System1997

The first of them entered service in 1997. The field also has 15 subsea structures — wellheads and templates on the seabed — which are drawn individually on the map.

Licence partners

  • Harbour Energy Norge AS50.00%
  • Equinor Energy AS27.50%
  • Vår Energi ASA22.50%

The field sits in blocks 6407/10, 6407/7, under production licences PL 132, PL 107, PL 107 C.

Questions people ask

Who operates the Njord field?
Njord is operated by Equinor Energy AS, in partnership with Harbour Energy Norge AS, Vår Energi ASA.
How much does Njord produce?
54,039 barrels of oil equivalent per day as of May 2026 — 1.3% of Norwegian Continental Shelf output, ranking 17 of 94 producing fields.
When did Njord start producing?
First production was reported in 1997, 11 years after discovery well 6407/7-1 S proved the field in 1986.

See it live

Njord is drawn on the NCS Live map with its outline, its pipelines and the vessels working it in real time — and på norsk. The directorate's own record is on the SODIR FactPages.

Other fields in the Norwegian sea

Ormen LangeÅsgardSkarvAasta HansteenHalten ØstHeidrunTyrihansVerdandeAll fields →