Sleipner Vest field

Sleipner Vest is producing 30,845 barrels of oil equivalent a day, 0.7% of everything the Norwegian Continental Shelf produced in August 2026, ranking 31 of the 95 fields in production.

Production
30,845 boe/d
Share of NCS
0.7%
Operator
Equinor Energy AS
First oil
1996

What it produces

In August 2026 the field delivered 30,845 barrels of oil equivalent a day, classified by the directorate as gas/condensate, roughly 24% oil and 72% gas by energy content. Output has moved up 110.3% over the past twelve months, and our own classification of the field's stage is growing. The field's best year was 1999, averaging 113,099 boe/d, today it runs at 27% of that.

Since 1996, Sleipner Vest has produced roughly 570 million barrels of oil equivalent in total. The directorate's estimate of recoverable resources is 1,348 million boe, of which about 96% had been recovered by 31.12.2025; 57 million boe remained as of 31.12.2025.

The story of Sleipner Vest

Sleipner’s place in engineering history was made twice in two years. In August 1991 the first Sleipner A concrete substructure sprang a leak and sank during a ballast test in the Gandsfjord, the loss registered on seismographs and forced a redesign; its replacement was on stream two years later.

From 1996 Sleipner became the site of the world’s first industrial-scale offshore carbon storage: CO₂ separated from the gas stream is injected into the Utsira formation rather than vented, a million tonnes a year, three decades before carbon capture became policy.

Timeline

  1. 1974
    Proven by exploration well 15/6-3
  2. 1991
    The first Sleipner A substructure sinks in the Gandsfjord
  3. 1993
    On stream with the rebuilt platform
  4. 1996
    World-first offshore CO₂ storage begins
  5. 1997
    Sleipner B (jacket 4 legs) enters service
  6. 1997
    Sleipner T (jacket 6 legs) enters service
  7. 1999
    Best year to date: 113,099 boe/d

Production by year, 1996–2026

1999 · 113,09919962026
OilGasNGL/condensateboe/d
Full table, year by year
YearOilGasNGLCondensateTotal boe/d
1996003,5578,54312,099
199707,62013,44938,98560,053
1998025,03714,90338,95078,890
1999053,42718,67740,995113,099
20000018,36538,87657,241
20010023,49537,05960,554
20020023,11734,25457,372
20030018,58330,88349,466
20040015,14725,53040,677
20050015,75630,63846,394
20060015,63727,43143,068
20070015,14227,55042,692
20080012,22321,77934,002
20090014,50421,39335,896
20100013,16618,04031,205
20110016,71925,08141,800
20120015,25122,85738,109
20130013,08318,20531,287
201411,20154,60710,1023,79279,702
201514,22770,2749,071093,572
201613,23362,2166,695082,144
201712,68859,4096,683078,780
201811,87754,4727,442073,792
20199,03148,5816,865064,476
20207,37739,4325,830052,639
20215,35431,3963,609040,359
20223,53322,6171,061027,209
20235,13632,9581,538039,632
20243,92223,4291,263028,615
20251,3067,64327509,224
20265,33420,1501,086026,570

Average daily rates per calendar year, from Sokkeldirektoratet's monthly production figures. The final year is the average through August 2026.

Emissions to air, 2003 to 2025

In 2025 Sleipner Vest released 191,800 tonnes of CO₂ and 765 tonnes of NOx to air, as reported by the operator to the Norwegian Environment Agency. That is 27% less than in 2020. The peak was 322,130 tonnes in 2011.

0 t161 kt322 kt200320082013201820232025

Offshore combustion, flaring and process emissions from the field's own installations; onshore terminals report separately. Source: norskeutslipp.no (Miljødirektoratet), 1997 onwards.

Discovery and drilling

The field was proven by exploration well 15/6-3 in 1974. The directorate's wellbore register lists 52 wellbores on Sleipner Vest: 14 exploration and 38 development. The deepest reaches 8,306 metres measured depth. Water depth at the field's installations is 82.5 to 110 metres.

Installations on Sleipner Vest

  • Sleipner BJacket 4 Legs1997
  • Sleipner TJacket 6 Legs1997

The first of them entered service in 1997. The field also has 1 subsea structures, wellheads and templates on the seabed, which are drawn individually on the map.

Simplified 3D model

Drag to turn it. Arrow keys rotate, plus and minus zoom.

Sleipner B (Jacket 4 Legs). Structure and layout are approximate; the waterline is indicative.

About this model

Archived photographic Sleipner B core informed by operator and March2009 views, not current as-built. Four-leg jacket to SODIR 108 m depth; older Statoil schematic says112 m. Dimensions, complete submerged bracing, conductors, equipment and crane pose schematic. Buried piles and other Sleipner installations omitted.

Reference

Licence partners

58%OPERATOR
  • Equinor Energy ASoperator58.35%
  • ORLEN Upstream Norway AS24.41%
  • Vår Energi ASA17.24%

The field sits in blocks 15/5, 15/6, 15/9, under production licences PL 1246, PL 029, PL 046.

Questions people ask

Who operates the Sleipner Vest field?
Sleipner Vest is operated by Equinor Energy AS, in partnership with ORLEN Upstream Norway AS and Vår Energi ASA.
Who owns Sleipner Vest?
The licence partners in Sleipner Vest are Equinor Energy AS (58.4%), ORLEN Upstream Norway AS (24.4%) and Vår Energi ASA (17.2%), according to the Norwegian Offshore Directorate (Sokkeldirektoratet).
How much does Sleipner Vest produce?
Sleipner Vest produces 30,845 barrels of oil equivalent per day as of August 2026, 0.7% of Norwegian Continental Shelf output, ranking 31 of 95 producing fields.
When did Sleipner Vest start producing?
First production from Sleipner Vest was reported in 1996, 22 years after discovery well 15/6-3 proved the field in 1974.
Where is Sleipner Vest located?
Sleipner Vest is in the North Sea, in blocks 15/5, 15/6 and 15/9, under production licences PL 1246, PL 029 and PL 046. Water depth at the installations is 82.5–110 metres.
How much oil and gas is left in Sleipner Vest?
The Norwegian Offshore Directorate (Sokkeldirektoratet) estimates that 57 million barrels of oil equivalent can still be recovered from Sleipner Vest as of 31 December 2025. Total recoverable resources are put at 1,348 million boe, of which about 96% has already been produced.
How long will Sleipner Vest keep producing?
The Norwegian Offshore Directorate (Sokkeldirektoratet) publishes no production forecast for individual fields, so there is no official end date to quote. It estimates that 57 million boe remain in Sleipner Vest as of 31 December 2025. No years figure is given: the production on file for Sleipner Vest does not match what the Norwegian Offshore Directorate says has been produced.
Is production at Sleipner Vest rising or falling?
Production at Sleipner Vest has moved up 110.3% over the past twelve months, and our own classification of the field's stage is growing. The best year was 1999, averaging 113,099 boe/d; today the field runs at 27% of that.
What installations are on Sleipner Vest?
Sleipner Vest has 2 surface installations: Sleipner B (Jacket 4 Legs, 1997) and Sleipner T (Jacket 6 Legs, 1997). It also has 1 subsea structures.
How many wells have been drilled on Sleipner Vest?
The Norwegian Offshore Directorate's wellbore register lists 52 wellbores on Sleipner Vest: 14 exploration and 38 development. The deepest reaches 8,306 metres measured depth.
How much CO₂ does Sleipner Vest emit?
In 2025 Sleipner Vest released 191,800 tonnes of CO₂ to air, as reported by the operator to the Norwegian Environment Agency, 27% less than in 2020.

See it live

Sleipner Vest is drawn on the NCS Live map with its outline, its pipelines and the vessels working it in real time, and på norsk. The directorate's own record is on the SODIR FactPages.

Other fields in the North sea

TrollJohan SverdrupOsebergGullfaks SørVisundSnorreBreidablikkBalderAll fields →

Largest fields on the shelf

TrollJohan SverdrupJohan CastbergOsebergÅsgardSnøhvitAll fields →