Valhall field
Valhall is producing 33,025 barrels of oil equivalent a day — 0.8% of everything the Norwegian Continental Shelf produced in May 2026, ranking 27 of the 94 fields in production.
What it produces
In May 2026 the field delivered 33,025 barrels of oil equivalent a day, classified by the directorate as oil — roughly 80% oil and 15% gas by energy content. Output has moved down 19.8% over the past twelve months, and the directorate's profile for the field is late life. The field's best year was 1999, averaging 113,817 boe/d — today it runs at 29% of that.
Since 1982, Valhall has produced roughly 1,049 million barrels of oil equivalent in total. The directorate's estimate of recoverable resources is 1,248 million boe, of which about 84% has now been recovered; 206 million boe remained as of 31.12.2025.
The story of Valhall
Valhall has produced several times what its developers believed the chalk would ever give up — the original plan assumed a couple of decades; the field has passed forty years and been rebuilt around new central facilities. Like Ekofisk it subsides as the chalk compacts, a fact its structures have had to be designed and re-designed around.
Timeline
- 1975Proven by exploration well 2/8-6
- 1982On stream
- 1996Valhall Wp (jacket 4 legs) enters service
- 1999Best year to date — 113,817 boe/d
- 2003Valhall Flanke Sør (jacket 4 legs) enters service
- 2004Valhall Flanke Nord (jacket 4 legs) enters service
- 2004Valhall Ip (jacket 4 legs) enters service
- 2011Power from shore, fed from Lista
- 2013Valhall Ph (jacket 4 legs) enters service
- 2019Valhall Flanke Vest (jacket 4 legs) enters service
Production by year, 1982–2026
Full table, year by year
| Year | Oil | Gas | NGL | Total boe/d |
|---|---|---|---|---|
| 1982 | 1,472 | 0 | 35 | 1,507 |
| 1983 | 16,659 | 1,746 | 1,149 | 19,554 |
| 1984 | 48,865 | 8,812 | 4,153 | 61,829 |
| 1985 | 47,928 | 8,065 | 5,393 | 61,386 |
| 1986 | 43,744 | 7,403 | 4,776 | 55,923 |
| 1987 | 59,939 | 10,716 | 5,789 | 76,444 |
| 1988 | 63,565 | 12,193 | 5,748 | 81,507 |
| 1989 | 73,047 | 14,504 | 6,482 | 94,032 |
| 1990 | 71,628 | 15,834 | 6,464 | 93,926 |
| 1991 | 64,523 | 14,103 | 4,287 | 82,914 |
| 1992 | 69,539 | 15,942 | 3,925 | 89,405 |
| 1993 | 60,948 | 13,784 | 3,284 | 78,015 |
| 1994 | 54,368 | 11,502 | 2,851 | 68,720 |
| 1995 | 60,141 | 13,571 | 3,285 | 76,998 |
| 1996 | 69,338 | 15,125 | 3,895 | 88,357 |
| 1997 | 78,011 | 16,206 | 4,329 | 98,546 |
| 1998 | 89,067 | 16,627 | 4,162 | 109,856 |
| 1999 | 91,511 | 17,854 | 4,452 | 113,817 |
| 2000 | 78,676 | 15,285 | 3,809 | 97,769 |
| 2001 | 75,184 | 15,205 | 3,669 | 94,058 |
| 2002 | 72,043 | 15,079 | 3,441 | 90,563 |
| 2003 | 71,605 | 10,895 | 3,397 | 85,897 |
| 2004 | 82,021 | 16,630 | 4,021 | 102,673 |
| 2005 | 83,231 | 16,483 | 4,000 | 103,714 |
| 2006 | 69,641 | 13,312 | 3,621 | 86,574 |
| 2007 | 58,784 | 10,484 | 2,860 | 72,128 |
| 2008 | 48,308 | 8,350 | 2,477 | 59,135 |
| 2009 | 39,048 | 6,017 | 1,922 | 46,988 |
| 2010 | 36,020 | 5,830 | 1,789 | 43,639 |
| 2011 | 28,301 | 4,301 | 1,279 | 33,881 |
| 2012 | 16,565 | 2,307 | 747 | 19,619 |
| 2013 | 30,473 | 4,086 | 1,306 | 35,865 |
| 2014 | 38,346 | 6,570 | 1,979 | 46,895 |
| 2015 | 41,407 | 7,519 | 2,126 | 51,051 |
| 2016 | 34,321 | 6,361 | 1,712 | 42,394 |
| 2017 | 30,492 | 5,259 | 1,465 | 37,216 |
| 2018 | 32,101 | 5,293 | 1,516 | 38,909 |
| 2019 | 35,257 | 5,448 | 1,871 | 42,576 |
| 2020 | 45,381 | 7,121 | 2,941 | 55,443 |
| 2021 | 41,338 | 6,966 | 2,617 | 50,920 |
| 2022 | 35,181 | 6,050 | 2,158 | 43,389 |
| 2023 | 34,531 | 5,913 | 2,144 | 42,587 |
| 2024 | 34,860 | 5,947 | 2,247 | 43,053 |
| 2025 | 30,608 | 6,004 | 1,962 | 38,575 |
| 2026 | 26,870 | 5,271 | 1,712 | 33,853 |
Average daily rates per calendar year, from Sokkeldirektoratet's monthly production figures. The final year is the average through May 2026.
Discovery and drilling
The field was proven by exploration well 2/8-6 in 1975. The directorate's wellbore register lists 232 wellbores on Valhall: 8 exploration and 221 development, plus 3 others. The deepest reaches 7,301 metres measured depth. Water depth at the field's installations is 66.7 to 76.8 metres.
How it reaches market
Valhall's production leaves the field by pipeline:
- Tie-In (Schematic Route)oil → Ekofisk J
The field has run on power from shore — fed from Lista since 2011 — rather than on gas turbines offshore.
Installations on Valhall
- Valhall Flanke NordJacket 4 Legs2004
- Valhall Flanke SørJacket 4 Legs2003
- Valhall Flanke VestJacket 4 Legs2019
- Valhall IpJacket 4 Legs2004
- Valhall PhJacket 4 Legs2013
- Valhall WpJacket 4 Legs1996
The first of them entered service in 1996. The field also has 3 subsea structures — wellheads and templates on the seabed — which are drawn individually on the map.
Licence partners
- Aker BP ASA90.00%
- INPEX Idemitsu Norge AS10.00%
The field sits in blocks 2/11, 2/8, under production licences PL 033 B, PL 006 B.
Questions people ask
- Who operates the Valhall field?
- Valhall is operated by Aker BP ASA, in partnership with INPEX Idemitsu Norge AS.
- How much does Valhall produce?
- 33,025 barrels of oil equivalent per day as of May 2026 — 0.8% of Norwegian Continental Shelf output, ranking 27 of 94 producing fields.
- When did Valhall start producing?
- First production was reported in 1982, 7 years after discovery well 2/8-6 proved the field in 1975.
See it live