Urd field
Urd is producing 1,970 barrels of oil equivalent a day — 0.1% of everything the Norwegian Continental Shelf produced in May 2026, ranking 82 of the 94 fields in production.
What it produces
In May 2026 the field delivered 1,970 barrels of oil equivalent a day, classified by the directorate as oil — almost entirely oil. Output has moved down 5.1% over the past twelve months, and the directorate's profile for the field is late life. The field's best year was 2006, averaging 36,741 boe/d — today it runs at 5% of that.
Since 2005, Urd has produced roughly 54 million barrels of oil equivalent in total. The directorate's estimate of recoverable resources is 60 million boe, of which about 90% has now been recovered; 6 million boe remained as of 31.12.2025.
Timeline
- 2000Proven by exploration well 6608/10-6
- 2005First production reported
- 2006Best year to date — 36,741 boe/d
Production by year, 2005–2026
Full table, year by year
| Year | Oil | Gas | NGL | Total boe/d |
|---|---|---|---|---|
| 2005 | 3,294 | 196 | 45 | 3,534 |
| 2006 | 35,236 | 1,191 | 314 | 36,741 |
| 2007 | 14,581 | 546 | 144 | 15,270 |
| 2008 | 8,772 | 355 | 96 | 9,223 |
| 2009 | 6,261 | 112 | 31 | 6,404 |
| 2010 | 7,136 | 50 | 14 | 7,200 |
| 2011 | 5,415 | 28 | 8 | 5,450 |
| 2012 | 5,580 | 39 | 11 | 5,630 |
| 2013 | 4,707 | 546 | 122 | 5,374 |
| 2014 | 6,678 | 1,114 | 253 | 8,045 |
| 2015 | 4,422 | 291 | 53 | 4,767 |
| 2016 | 4,474 | 338 | 57 | 4,870 |
| 2017 | 8,921 | 139 | 10 | 9,071 |
| 2018 | 4,736 | 0 | 0 | 4,736 |
| 2019 | 3,184 | 0 | 0 | 3,184 |
| 2020 | 2,175 | 0 | 0 | 2,175 |
| 2021 | 3,109 | 0 | 0 | 3,109 |
| 2022 | 4,127 | 0 | 0 | 4,127 |
| 2023 | 1,960 | 0 | 0 | 1,960 |
| 2024 | 3,186 | 0 | 0 | 3,186 |
| 2025 | 2,157 | 1 | 1 | 2,159 |
| 2026 | 2,808 | 15 | 5 | 2,828 |
Average daily rates per calendar year, from Sokkeldirektoratet's monthly production figures. The final year is the average through May 2026.
Discovery and drilling
The field was proven by exploration well 6608/10-6 in 2000. The directorate's wellbore register lists 30 wellbores on Urd: 9 exploration and 21 development. The deepest reaches 3,981 metres measured depth. Water depth at the field's installations is 390 metres.
Installations on Urd
The field also has 3 subsea structures — wellheads and templates on the seabed — which are drawn individually on the map.
Licence partners
- Equinor Energy AS63.95%
- Petoro AS24.55%
- DNO Norge AS11.50%
The field sits in block 6608/10, under production licence PL 128.
Questions people ask
- Who operates the Urd field?
- Urd is operated by Equinor Energy AS, in partnership with Petoro AS, DNO Norge AS.
- How much does Urd produce?
- 1,970 barrels of oil equivalent per day as of May 2026 — 0.1% of Norwegian Continental Shelf output, ranking 82 of 94 producing fields.
- When did Urd start producing?
- First production was reported in 2005, 5 years after discovery well 6608/10-6 proved the field in 2000.
See it live
Urd is drawn on the NCS Live map with its outline, its pipelines and the vessels working it in real time — and på norsk. The directorate's own record is on the SODIR FactPages.
Other fields in the Norwegian sea
Ormen LangeÅsgardSkarvAasta HansteenHalten ØstHeidrunTyrihansNjordAll fields →